Condo Living
Condo Flooring Rules, Explained: IIC, STC and Getting Board Approval

Condo flooring rules come from your corporation's own documents, not from a rating printed on a plank. IIC measures impact noise and STC measures airborne noise, and both describe a finished assembly of slab, underlay and plank rather than one product. Ask the property management office for the current requirement in writing before you choose anything.
What does an IIC rating actually measure?
Footsteps travelling down through the floor. Impact Insulation Class describes how much of a hard knock on the floor above arrives in the room below, and the test is run on a whole assembly: a structural slab of a stated thickness, the underlay on top of it, the plank, and in some tests the ceiling underneath. Change any one layer and the number moves.
Which is why a figure on a plank box tells you very little by itself. Ask what assembly it was measured on, then compare that with yours. The slab in a 1970s tower is not the slab in a 2010s one, and a suspended ceiling below you changes the result again.
There is also a question no number answers: whether it satisfies your corporation. That is a document question, not a physics question, and Floorrable settles it with the building before anything is ordered.
What STC measures, and why it is a different problem
Airborne sound rather than footsteps. Sound Transmission Class describes how well an assembly blocks voices, television and music, and across a floor and ceiling it is set mostly by the structure between the two suites. The finish you walk on does very little for it.
Owners often arrive with the wrong worry because of this. The complaint that follows a carpet to hard floor change is nearly always impact noise: heels, a dropped pan, a dog's claws, a chair pushed back from the table. Replacing carpet barely touches airborne sound, so no plank you choose will quiet a conversation you can already hear through the slab.
Both numbers share one trap. They are lab results for a specific build-up, so two buildings quoting the same figure can be asking for different floors, and a figure a neighbour repeats from another tower does not transfer to yours.
Where condo flooring rules come from
Your corporation's own documents, in a fixed order. The Condominium Authority of Ontario publishes that order: the Condominium Act sits above everything, then the declaration, then the by-laws, then the rules. Where your flooring requirement sits decides how permanent it is.
A declaration is the hardest of the three to move, since amending one normally takes written consent from 80 or 90 percent of owners. A rule is at the other end of the scale. It has to be reasonable, but it needs no registration at the Land Registry Office to take effect, so the requirement in force today may not appear in the package you were handed at closing.
Ask the management office for all of it: the declaration, the current rules and any separate flooring policy. Then ask the question that decides your options, which is whether the requirement is written against the whole build-up or against the plank by itself. Condo flooring and building approvals covers what the application itself holds.
Which floors clear a rule most easily?
The ones the rule names, and most rules describe the underlay rather than the plank. A typical requirement asks for a floating floor over an acoustic underlay of a stated type or thickness.
A build-up, in other words, not a brand.
In the Marina Collection, SPC vinyl plank floors arrive with the pad already bonded to the plank. That pad satisfies some buildings on its own and not others. AC4 laminate floors take a separate underlay in any case, so the product the building names simply goes underneath and the question settles itself. The trade off with laminate is that it wants dry rooms.
Real wood is where a rule bites hardest. Kingsway, Atelier and the Metro hybrid all nail down or glue down, so over a concrete slab they are bonded to it or fixed to plywood laid over it first. A rule that specifies a floating assembly rules out both methods, which is worth knowing before you fall for a colour.
| Term | What it describes | Who sets the number you must meet |
|---|---|---|
| IIC | Impact noise: footsteps and dropped objects going down through the floor | Your corporation, in its declaration, by-laws, rules or flooring policy |
| STC | Airborne noise: voices, television and music | Mostly the building's structure, which you cannot change |
| The assembly | Slab, underlay and plank together, as tested | The rule names it, and the installer has to build it |
Check the rule before you choose a floor
- Ask the property management office, in writing, for the declaration, the current rules and any flooring policy.
- Ask which assembly the requirement applies to, and what documents the board wants with an application.
- Take that paperwork to the samples rather than the other way round, so you are only looking at floors you can actually have.
- With the rule settled, get a price range for your unit. The order waits until the building has signed off and the floor has been measured.
How a Floorrable job runs lists seven steps, and the acoustic requirement is confirmed at the third of them, well ahead of any deposit. That sequence exists because an approval refused after the material lands is the expensive version of this job.
Floors that fit this guide
Browse every floorFrequently asked questions
Whatever your own corporation's documents say. The requirement comes from the declaration, the by-laws, the rules or a separate flooring policy, and it differs from building to building, so a figure a neighbour quotes from another tower does not transfer. Ask management for yours in writing.
Yes, where the corporation's documents give it that authority, and the moment to find out is before material is ordered. A board applies the requirement already written into the declaration, by-laws or rules. A floor laid without approval can have to come back up, at the owner's expense.
That depends on whether your building's rule counts an attached pad as the underlay. Some corporations name a specific product or thickness, in which case the pad does not satisfy it and another layer goes beneath. Ask before ordering, because it changes the finished height.
No. IIC covers impact noise, meaning footsteps and dropped objects travelling down through the floor. STC covers airborne noise such as voices and television. A new floor and underlay can shift the impact side a little, and do almost nothing for the airborne side.





