We use cookies and similar technologies to run our site, remember things like the floors you save, and understand how visitors use the site so we can improve it. We don't use advertising cookies, and we never sell your information. You can change your cookie settings at any time. See our Privacy Policy and Cookie Policy.

Skip to content

Made for condo living

Condo flooring installation in Toronto

Your building has rules. We check them first. Getting them wrong means delays, or a rejected project.

Calm condo bedroom with pale wide-plank flooring in soft morning light

What we specialize in

The building side of a condo floor.

  • Acoustic rating and underlayment checked against your building's own requirements
  • The approval package assembled for your board or property manager: product sheet, underlay specification and the installer's insurance and WSIB documents
  • Renovation hours and elevator rules confirmed, so you know exactly what to book and when, and the install is scheduled inside that window
  • Nothing ordered until every requirement is confirmed
  • One company coordinating the product, approval, measurement and installation
Check my building

The estimate asks for your building's name or address.

What approval involves

Three things your building checks.

The rules come from your condo corporation, not from us or from the product, and every building writes its own.

1

Underlay and sound

Many buildings set a minimum acoustic standard for the underlay so the suite below does not hear footsteps, and some want the product sheet before they approve anything. We match the floor and the underlay to your building's rule, not to a generic one.

2

The approval itself

Most boards or property managers want to see what is going in before work starts, usually through a renovation application. Final approval rests with your building, and its meeting schedule sets the pace, so we tell you where the application stands rather than guess at a date.

3

Access and the elevator

Renovation hours, the service elevator booking and where trades may unload. Material goes up and the old floor comes down inside the booked window, so the install day is planned around it.

Who prepares what

Floorrable assembles the package: the product sheet for the floor you chose, the underlay specification, and the installer's insurance and WSIB documents. Once you approve the quote we submit it to your board or property manager, and nothing is ordered until the building says yes. If a floor is refused, we propose one that meets the rule at the same price where we can, and if nothing suitable clears it we cancel the job and refund your deposit in full.

What you need from your building

  • Your building's flooring or renovation rule, usually from the property manager or in the renovation guideline
  • The renovation application form, and whether the board or the manager signs it off
  • The service elevator rules: notice needed, booking fee, deposit, and who has to sign
  • Permitted renovation hours, including any quiet hours for cutting

Humber Bay Shores is where we do most of this work, and its towers show how much the rules differ from one corporation to the next. Start with Humber Bay condo flooring for the buildings, or read how board approval works in a Humber Bay condo for the application itself.

Common questions

Almost always. Most Toronto condo corporations want to see what is going in before work starts, usually through a renovation application with the product sheet and the underlay specification. We confirm your building's rule before anything is ordered.

Floorrable assembles the package: the product sheet, the underlay specification and the installer's insurance and WSIB documents. Once you approve the quote we submit it to your board or property manager. If your building wants the application in the owner's name, we prepare it for you to sign.

Nothing is ordered until the building says yes, so a refusal costs you nothing. We propose a floor that meets the rule at the same price where we can. If nothing suitable clears it, we cancel the job and refund your deposit in full.

The booking is made in your name: most buildings charge the fee and any deposit to the unit and want the resident's signature. We confirm your building's elevator rules, tell you exactly what to book and when, and schedule the install inside that window.

The full sequence, from first question to final walk-through, is on how it works.